02/08/90 AST RESEARCH TECHNICAL BULLETIN TB-0050 10-24-84 DIAGNOSTIC TESTING OF THE PARALLEL PORT In order to perform a thorough test of AST's parallel port (when running IBM diagnostics) you need to provide the incoming signals to the port. This may be accomplished by constructing a wrap plug and installing it on the parallel port connector. To construct a wrap plug use a DB25 male connector. Utilizing a minimum of 30AWG wire make connections as listed below: 1 > 13 2 > 15 10 > 16 11 > 17 12 > 14